Project: Water supply of western areas of Nafpaktos (AFROXYLIA – MAMOULADA – DEPARTMENT OF PALEOPANAGIAS ) from Pitsineika reservoir, Evinos water. Main project: D.EYA Nafpaktos. Date: 2006 Description: A plan was made to construct a water transport pipeline from an existing reservoir, fed by drilling, to three new reservoirs in order to strengthen the water […]
Project: Demarcation of Evinos River with a total length of 10.00 Km (From Messolonghi Bridge to Perithoria). Main project: Region of Western Greece. Date : 2006 Description : A topographic survey of the river was carried out along a length of 10.0 Km – Hydraulic study to calculate the flood supply and proposal of demarcation […]