Project: Study of road construction and level junctions for the construction of a tunnel in the city of Antananarivo (Capital of Madagascar).
Main project: Ministry of Public Works of Madagascar.
Date: 2017
Description: The excavation of the tunnel was determined and two levels were designed
nodes at the tunnel exits. For the execution of the project, the following were done:
- Detailed planning and positioning of nodes
- Road construction study of the tunnel
- Rainwater runoff hydraulic study
- Marking study
- Topographic survey in the wider area of the tunnel