Project : Improvement of Tyria-Sistrouni road – Modification of road design.
Main project : Region of Epirus – JAGOIL SA
Date : 2013
Description : A detailed design of three level nodes was done by modifying the original study and adapting it to the new nodes. To complete the studies, the following tasks were carried out:
- Detailed design of nodes.
- Hydraulic study of rainwater runoff in the junction areas.
- Land registration.
- Drawing the knots.
The project has been implemented and is in use.