Project: Madagascar Ministry of Public Works. Main project: Municipality of Nafpaktia. Date: 2017 Description: Road construction study for the creation of an Asian artery in the center of the capital of Madagascar with a total length of 12 Km, with the aim of decongesting the area and embedding an irrigation canal. For the execution of […]
Project: Road construction study for the urban regeneration of the historic center of Nafpaktos. Main project: Municipality of Nafpaktia. Date: 2017 Description: An urban road construction study was prepared for the central streets of the city with the aim of combining roads, pedestrians and cycle paths. For the execution of the project: -Detailed planning and […]
Project: The study will include collecting and analyzing data, assessing the current situation, and proposing solutions and strategies to improve traffic. The study is expected to contribute to the development of the quality of life in the area, reducing commuting time and improving safety and accessibility. Main project: Municipality of Kifissia Date: 2017
Project: Study of road construction and level junctions for the construction of a tunnel in the city of Antananarivo (Capital of Madagascar). Main project: Ministry of Public Works of Madagascar. Date: 2017 Description: The excavation of the tunnel was determined and two levels were designednodes at the tunnel exits. For the execution of the project, […]
Project : Improvement of Tyria-Sistrouni road – Modification of road design. Main project : Region of Epirus – JAGOIL SA Date : 2013 Description : A detailed design of three level nodes was done by modifying the original study and adapting it to the new nodes. To complete the studies, the following tasks were carried […]
Nafpaktos landfill bypass
Project : Nafpaktos Landfill Bypass Main project : MUNICIPALITY OF NAYPAKTOS Date : 2013 Description : DEDAELED DESIGN
Project : Cadastre of eastern and western areas of the city of Nafpaktos. Main project : Topodomiki S.A. Date : 2012 Description : : The land registration of an area of 5,500 acres with more than 3,500 owners was done. The work done to complete the project was:
Project : TRAFFIC STUDY AND ROAD STUDY ON THE KORAI-L. CAIRO- METROPOLITAN KYDONIA AND URANIA- DEINOKRATES- CAIRO JUNCTIONS. Main project : Municipality of Dionysos. Date : 2010 Description : A roundabout was designed (composition of two roundabouts) to determine the route of vehicles in order to reduce their intersections. For the execution of the project: […]
Project: Water supply of western areas of Nafpaktos (AFROXYLIA – MAMOULADA – DEPARTMENT OF PALEOPANAGIAS ) from Pitsineika reservoir, Evinos water. Main project: D.EYA Nafpaktos. Date: 2006 Description: A plan was made to construct a water transport pipeline from an existing reservoir, fed by drilling, to three new reservoirs in order to strengthen the water […]
Project: Demarcation of Evinos River with a total length of 10.00 Km (From Messolonghi Bridge to Perithoria). Main project: Region of Western Greece. Date : 2006 Description : A topographic survey of the river was carried out along a length of 10.0 Km – Hydraulic study to calculate the flood supply and proposal of demarcation […]
Project : Extension of the layout plan of Skala Oropou and definition of Construction conditions. Main project : Municipality of Oropos Date : 2006 Description : A topographic survey and Cadastre of a total area of 2,100 acres was carried out, as well as the implementation of the landscape plan of the entire area. The […]
Main project : J&P-AVAX SA Date : 2004 Description : The uneven K3 junction was re-designed in order to reduce its occupancy range. The work done to complete the project was: The project has been implemented and is in use.