Study for the construction of a roundabout on M. Kydonia and Kairi streets

Project : TRAFFIC STUDY AND ROAD STUDY ON THE KORAI-L. CAIRO- METROPOLITAN KYDONIA AND URANIA- DEINOKRATES- CAIRO JUNCTIONS.

Main project : Municipality of Dionysos.

Date : 2010

Description : A roundabout was designed (composition of two roundabouts) to determine the route of vehicles in order to reduce their intersections. For the execution of the project:

  • Detailed planning and positioning of the node
  • Rainwater runoff hydraulic study
  • Electric lighting study.
  • Topographical impression.
  • Plotting the node.

The project has been implemented and is in use.