Project : TRAFFIC STUDY AND ROAD STUDY ON THE KORAI-L. CAIRO- METROPOLITAN KYDONIA AND URANIA- DEINOKRATES- CAIRO JUNCTIONS.
Main project : Municipality of Dionysos.
Date : 2010
Description : A roundabout was designed (composition of two roundabouts) to determine the route of vehicles in order to reduce their intersections. For the execution of the project:
- Detailed planning and positioning of the node
- Rainwater runoff hydraulic study
- Electric lighting study.
- Topographical impression.
- Plotting the node.
The project has been implemented and is in use.