{"id":31471,"date":"2006-01-09T11:27:43","date_gmt":"2006-01-09T11:27:43","guid":{"rendered":"https:\/\/orio.gr\/water-supply-of-western-areas-of-nafpaktos\/"},"modified":"2024-01-18T09:41:18","modified_gmt":"2024-01-18T09:41:18","slug":"water-supply-of-western-areas-of-nafpaktos","status":"publish","type":"post","link":"https:\/\/orio.gr\/en\/water-supply-of-western-areas-of-nafpaktos\/","title":{"rendered":"Water supply of western areas of Nafpaktos"},"content":{"rendered":"\n<p><strong>Project:<\/strong> Water supply of western areas of Nafpaktos (AFROXYLIA &#8211; MAMOULADA &#8211; DEPARTMENT OF PALEOPANAGIAS ) from Pitsineika reservoir, Evinos water.<\/p>\n\n<p><strong>Main project:<\/strong> D.EYA Nafpaktos.<\/p>\n\n<p><strong>Date:<\/strong> 2006<\/p>\n\n<p><strong>Description:<\/strong> A plan was made to construct a water transport pipeline from an existing reservoir, fed by drilling, to three new reservoirs in order to strengthen the water supply of the western areas of Nafpaktos. The total length of the pipeline is 11.00 kilometers while three new storage tanks were designed and calculated. The work done to complete the project was:<\/p>\n\n<ul class=\"wp-block-list\">\n<li>Hydraulic study with creation of project detail plans.<\/li>\n\n\n\n<li>Static study of reservoirs.<\/li>\n\n\n\n<li>Compilation of tender documents.<\/li>\n<\/ul>\n\n<p><strong>The project has been implemented.<\/strong><\/p>\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"335\" data-id=\"30815\" src=\"https:\/\/orio.gr\/wp-content\/uploads\/2024\/01\/orio-idreysi-naypaktou-2-2-1024x335.jpg\" alt=\"\" class=\"wp-image-30815\" srcset=\"https:\/\/orio.gr\/wp-content\/uploads\/2024\/01\/orio-idreysi-naypaktou-2-2-1024x335.jpg 1024w, https:\/\/orio.gr\/wp-content\/uploads\/2024\/01\/orio-idreysi-naypaktou-2-2-300x98.jpg 300w, https:\/\/orio.gr\/wp-content\/uploads\/2024\/01\/orio-idreysi-naypaktou-2-2-768x251.jpg 768w, https:\/\/orio.gr\/wp-content\/uploads\/2024\/01\/orio-idreysi-naypaktou-2-2-1300x427.jpg 1300w, https:\/\/orio.gr\/wp-content\/uploads\/2024\/01\/orio-idreysi-naypaktou-2-2.jpg 1307w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/figure>\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"308\" src=\"https:\/\/orio.gr\/wp-content\/uploads\/2024\/01\/orio-idreysi-naypaktou-3-2-1024x308.jpg\" alt=\"\" class=\"wp-image-30816\" srcset=\"https:\/\/orio.gr\/wp-content\/uploads\/2024\/01\/orio-idreysi-naypaktou-3-2-1024x308.jpg 1024w, https:\/\/orio.gr\/wp-content\/uploads\/2024\/01\/orio-idreysi-naypaktou-3-2-300x90.jpg 300w, https:\/\/orio.gr\/wp-content\/uploads\/2024\/01\/orio-idreysi-naypaktou-3-2-768x231.jpg 768w, https:\/\/orio.gr\/wp-content\/uploads\/2024\/01\/orio-idreysi-naypaktou-3-2.jpg 1305w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"478\" src=\"https:\/\/orio.gr\/wp-content\/uploads\/2024\/01\/orio-idreysi-naypaktou-4-2-1024x478.jpg\" alt=\"\" class=\"wp-image-30817\" srcset=\"https:\/\/orio.gr\/wp-content\/uploads\/2024\/01\/orio-idreysi-naypaktou-4-2-1024x478.jpg 1024w, https:\/\/orio.gr\/wp-content\/uploads\/2024\/01\/orio-idreysi-naypaktou-4-2-300x140.jpg 300w, https:\/\/orio.gr\/wp-content\/uploads\/2024\/01\/orio-idreysi-naypaktou-4-2-768x359.jpg 768w, https:\/\/orio.gr\/wp-content\/uploads\/2024\/01\/orio-idreysi-naypaktou-4-2.jpg 1306w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Project: Water supply of western areas of Nafpaktos (AFROXYLIA &#8211; MAMOULADA &#8211; DEPARTMENT OF PALEOPANAGIAS ) from Pitsineika reservoir, Evinos water. Main project: D.EYA Nafpaktos. Date: 2006 Description: A plan was made to construct a water transport pipeline from an existing reservoir, fed by drilling, to three new reservoirs in order to strengthen the water [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":31872,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[64],"tags":[],"class_list":["post-31471","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-water-and-environment"],"_links":{"self":[{"href":"https:\/\/orio.gr\/en\/wp-json\/wp\/v2\/posts\/31471","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/orio.gr\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/orio.gr\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/orio.gr\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/orio.gr\/en\/wp-json\/wp\/v2\/comments?post=31471"}],"version-history":[{"count":3,"href":"https:\/\/orio.gr\/en\/wp-json\/wp\/v2\/posts\/31471\/revisions"}],"predecessor-version":[{"id":31474,"href":"https:\/\/orio.gr\/en\/wp-json\/wp\/v2\/posts\/31471\/revisions\/31474"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/orio.gr\/en\/wp-json\/wp\/v2\/media\/31872"}],"wp:attachment":[{"href":"https:\/\/orio.gr\/en\/wp-json\/wp\/v2\/media?parent=31471"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/orio.gr\/en\/wp-json\/wp\/v2\/categories?post=31471"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/orio.gr\/en\/wp-json\/wp\/v2\/tags?post=31471"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}