{"id":31466,"date":"2017-01-04T11:05:42","date_gmt":"2017-01-04T11:05:42","guid":{"rendered":"https:\/\/orio.gr\/tunnel-road-construction-in-antananarivo-capital-of-madagascar\/"},"modified":"2024-01-18T09:41:00","modified_gmt":"2024-01-18T09:41:00","slug":"tunnel-road-construction-in-antananarivo-capital-of-madagascar","status":"publish","type":"post","link":"https:\/\/orio.gr\/en\/tunnel-road-construction-in-antananarivo-capital-of-madagascar\/","title":{"rendered":"Tunnel Road Construction in Antananarivo (Capital of Madagascar)"},"content":{"rendered":"\n<p><strong>Project:<\/strong> Study of road construction and level junctions for the construction of a tunnel in the city of Antananarivo (Capital of Madagascar).<\/p>\n\n<p><strong>Main project:<\/strong> Ministry of Public Works of Madagascar.<\/p>\n\n<p><strong>Date:<\/strong> 2017<\/p>\n\n<p><strong>Description:<\/strong> The excavation of the tunnel was determined and two levels were designed<br\/>nodes at the tunnel exits. For the execution of the project, the following were done:<\/p>\n\n<ul class=\"wp-block-list\">\n<li>Detailed planning and positioning of nodes<\/li>\n\n\n\n<li>Road construction study of the tunnel<\/li>\n\n\n\n<li>Rainwater runoff hydraulic study<\/li>\n\n\n\n<li>Marking study<\/li>\n\n\n\n<li>Topographic survey in the wider area of \u200b\u200bthe tunnel<\/li>\n<\/ul>\n\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"537\" src=\"https:\/\/orio.gr\/wp-content\/uploads\/2024\/01\/orio-madagaskari-2-1024x537.png\" alt=\"\" class=\"wp-image-30107\" srcset=\"https:\/\/orio.gr\/wp-content\/uploads\/2024\/01\/orio-madagaskari-2-1024x537.png 1024w, https:\/\/orio.gr\/wp-content\/uploads\/2024\/01\/orio-madagaskari-2-300x157.png 300w, https:\/\/orio.gr\/wp-content\/uploads\/2024\/01\/orio-madagaskari-2-768x403.png 768w, https:\/\/orio.gr\/wp-content\/uploads\/2024\/01\/orio-madagaskari-2.png 1200w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"499\" src=\"https:\/\/orio.gr\/wp-content\/uploads\/2024\/01\/orio-madagaskari-3-1024x499.png\" alt=\"\" class=\"wp-image-30108\" srcset=\"https:\/\/orio.gr\/wp-content\/uploads\/2024\/01\/orio-madagaskari-3-1024x499.png 1024w, https:\/\/orio.gr\/wp-content\/uploads\/2024\/01\/orio-madagaskari-3-300x146.png 300w, https:\/\/orio.gr\/wp-content\/uploads\/2024\/01\/orio-madagaskari-3-768x374.png 768w, https:\/\/orio.gr\/wp-content\/uploads\/2024\/01\/orio-madagaskari-3.png 1200w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"637\" src=\"https:\/\/orio.gr\/wp-content\/uploads\/2024\/01\/orio-madagaskari-4-1024x637.png\" alt=\"\" class=\"wp-image-30109\" srcset=\"https:\/\/orio.gr\/wp-content\/uploads\/2024\/01\/orio-madagaskari-4-1024x637.png 1024w, https:\/\/orio.gr\/wp-content\/uploads\/2024\/01\/orio-madagaskari-4-300x187.png 300w, https:\/\/orio.gr\/wp-content\/uploads\/2024\/01\/orio-madagaskari-4-768x478.png 768w, https:\/\/orio.gr\/wp-content\/uploads\/2024\/01\/orio-madagaskari-4-1536x956.png 1536w, https:\/\/orio.gr\/wp-content\/uploads\/2024\/01\/orio-madagaskari-4.png 1900w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Project: Study of road construction and level junctions for the construction of a tunnel in the city of Antananarivo (Capital of Madagascar). Main project: Ministry of Public Works of Madagascar. Date: 2017 Description: The excavation of the tunnel was determined and two levels were designednodes at the tunnel exits. For the execution of the project, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":31869,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[65],"tags":[],"class_list":["post-31466","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-road-design-studies"],"_links":{"self":[{"href":"https:\/\/orio.gr\/en\/wp-json\/wp\/v2\/posts\/31466","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/orio.gr\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/orio.gr\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/orio.gr\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/orio.gr\/en\/wp-json\/wp\/v2\/comments?post=31466"}],"version-history":[{"count":1,"href":"https:\/\/orio.gr\/en\/wp-json\/wp\/v2\/posts\/31466\/revisions"}],"predecessor-version":[{"id":31468,"href":"https:\/\/orio.gr\/en\/wp-json\/wp\/v2\/posts\/31466\/revisions\/31468"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/orio.gr\/en\/wp-json\/wp\/v2\/media\/31869"}],"wp:attachment":[{"href":"https:\/\/orio.gr\/en\/wp-json\/wp\/v2\/media?parent=31466"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/orio.gr\/en\/wp-json\/wp\/v2\/categories?post=31466"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/orio.gr\/en\/wp-json\/wp\/v2\/tags?post=31466"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}